New Towers, Old Problem: Finishing Dust
Gardencity towers look pristine from the lobby but carry concrete dust, paint specks and packaging fibres inside. Dry dusting just moves it; our protocol is HEPA vacuum first on every surface, damp-wipe of specks off tiles and frames, then the standard deep clean on top.
Fixed Card for Phase 5
| Home | Rate | Hours |
|---|---|---|
| Studio / 1 RK | ₹2,000 | 4 |
| 1 BHK | ₹2,500 | 5–6 |
| 2 BHK | ₹4,500 | 6–8 |
| 3 BHK | ₹5,500 | 8–10 |
Locked on the call, same on the invoice, walkthrough before payment, ₹10k damage cover. No “new building” surcharge.
First-Year Rhythm for Phase 5
New towers settle for the first year — we recommend quarterly deep cleans in year one (construction dust keeps arriving), then the normal 3–6 month rhythm, with weekly house cleaning in between.
Book Phase 5
+91 92679 05943 — tower name, BHK, whether it is a fresh handover. Fixed figure in under 2 minutes; same-day before noon; payment after the walkthrough.

New-Tower Handover Cleaning
Phase 5 buyers usually take possession with the builder’s finish still shedding — paint specks on tiles, cement haze on glass, stickers on appliances. We run the post-construction pass first: HEPA everything, damp-wipe specks off tiles and frames, peel and clean appliance films, then the standard deep clean on top. Photos before/after for the builder record are standard.
First-year rhythm: quarterly deep cleans while neighbouring plots still build, then 3–6 months. Weekly house cleaning in between keeps the dust layer from bonding.
The Gardencity Detail
Phase 5 towers are still finishing — we run the post-construction pass (HEPA + paint-speck damp-wipe) before the standard deep clean, and we send before/after photos for the builder record.
New Towers Still Settling
Phase 5 towers are recent enough that finishing dust is still a fact of life — neighbouring plots keep working. For first-time visits in a new flat we run the post-construction pass ahead of the standard deep clean: HEPA extraction on every surface, then a damp-wipe of paint specks on tiles, frames and fittings.
Dated before-and-after photos go to you the same day, which more than one owner here has used as a handover record with the builder. Year one in a settling tower usually wants a quarterly rhythm; after that, the normal 3–6 month gap between deep cleans does the job.
One timing tip for settling towers: where possible, book the first deep clean before carpets and heavy furniture go in — empty rooms make the HEPA pass and the paint-speck damp-wipe significantly faster. The dated photos from that visit become the clean baseline for every later clean.
